105316/HYB/21
|
Hybrid application comprising: (a) Full application for the creation of a green hydrogen production facility (10MW capacity, circa 4 tonnes of hydrogen production per day), including battery storage, compressors, hydrogen storage and tanker loading facilities. (b) Outline application with all matters reserved for an expanded green hydrogen production facility within wider site (200MW capacity, up to 50 tonnes of hydrogen storage).
|
Power Station 132 Manchester Road Carrington M31 4AY
Reference | 105316/HYB/21 |
---|---|
Alternative Reference | PP-10034385 |
Application Received | Tue 20 Jul 2021 |
Application Validated | Tue 20 Jul 2021 |
Address | Power Station 132 Manchester Road Carrington M31 4AY |
Proposal | Hybrid application comprising: (a) Full application for the creation of a green hydrogen production facility (10MW capacity, circa 4 tonnes of hydrogen production per day), including battery storage, compressors, hydrogen storage and tanker loading facilities. (b) Outline application with all matters reserved for an expanded green hydrogen production facility within wider site (200MW capacity, up to 50 tonnes of hydrogen storage). |
Status | Decided |
Decision | Approve with Conditions |
Decision Issued Date | Thu 29 Sep 2022 |
Appeal Status | Unknown |
Appeal Decision | Not Available |
There are 39 documents associated with this application.
There are 0 cases associated with this application.
There is 1 property associated with this application.