88589/FUL/16 | Construction of new pedestrian and cycle bridge, with ramps, crossing the Bridgewater Canal to the east of Viaduct Road along with the formation of a new canal towpath, approximately 250m long, along the south side of the canal from the new bridge to Wharf Road. Associated construction accesses and temporary footpath diversion. | Land East Of Viaduct Road Altrincham
Reference 88589/FUL/16
Alternative Reference PP-05195439
Application Received Wed 01 Jun 2016
Application Validated Wed 01 Jun 2016
Address Land East Of Viaduct Road Altrincham
Proposal Construction of new pedestrian and cycle bridge, with ramps, crossing the Bridgewater Canal to the east of Viaduct Road along with the formation of a new canal towpath, approximately 250m long, along the south side of the canal from the new bridge to Wharf Road. Associated construction accesses and temporary footpath diversion.
Status Decided
Decision Approve with Conditions
Decision Issued Date Mon 15 Aug 2016
Appeal Status Unknown
Appeal Decision Not Available

There are 7 documents associated with this application.

There are 0 cases associated with this application.