88589/FUL/16
|
Construction of new pedestrian and cycle bridge, with ramps, crossing the Bridgewater Canal to the east of Viaduct Road along with the formation of a new canal towpath, approximately 250m long, along the south side of the canal from the new bridge to Wharf Road. Associated construction accesses and temporary footpath diversion.
|
Land East Of Viaduct Road Altrincham
Name | Constraint Type | Status |
---|---|---|
Metrolink 200m buffer | Metrolink Consultation Zone | Not Available |
Flood storage areas - land designated to store flood water | EA Flood Storage Areas | Not Available |
Main employment Areas - E7 | UDP Policies | Not Available |
Main Industrial Areas - E7 | UDP Policies | Not Available |
River Valley Flood Risk - ENV13 | UDP Policies | Not Available |
Protection of Open Space - OSR5 | UDP Policies | Not Available |
Community Forest / Tree Planting - ENV15/ENV16 | UDP Policies | Not Available |
Sites of Importance for Nature Conservation - ENV9 | UDP Policies | Not Available |
Protected Linear Open Land - OSR6 | UDP Policies | Not Available |
Sites of Importance for Nature Conservation - ENV8 | Areas of Nature Conservation | Not Available |
Public Rights of Way | Right of Way | Not Available |
Woodford Aerodrome - All development exceeding 91.4 metres | Airport Consultation Zone | Not Available |
Manchester Intl Airport - All development exceeding 90 metre | Airport Consultation Zone | Not Available |
EA Flood Risk Zone 3 | Not Available | Not Available |
EA 20m Main River buffer | EA Bank Top Flood Zone | Not Available |
Smoke Control Zone | Smoke Control Zone | Not Available |
Critical Drainage Areas | Critical Drainage Zones | Not Available |